‌
Skip to main content
Charlton Road Walking and Cycling Scheme consultation

Introduction

This scheme is part of a package of works by Bristol City Council and South Gloucestershire Council to prepare for many more people visiting and travelling through the area when the new Aviva Arena opens in 2028.

 The improvements aim to:

  • provide people with safer walking, wheeling and cycling routes so more people are encouraged to travel by these modes of transport

  • improve journeys for those travelling by bus

  • manage traffic and parking, especially the future demand by Arena visitors

The map shows the extent of the highway proposals for Charlton Road.

Map showing the whole route of Charlton Road, with specific sections highlighted. These sections are described in the text below.

In the survey that follows, the proposals are described in more detail in 5 sections:

  • The whole route
  • Section A – Pen Park Road roundabout to Briarside Road
  • Section B – Briarside Road to the shops, including Turnbridge Road
  • Section C – The shops to Bindon Drive, including Chakeshill Drive
  • Section D – Bindon Drive to Pensfield Park
Progress bar
0%