Assessment of current well control methodologies and implementation of process driven work flow model

 

1. Do you think the current well control theory and practice requires additional work flow process and role specific duties?

 

2. Do you refer to your Company Management System well control guidelines or IWCF well control guidelines during preparations of your instructions to the drilling and workover team?

(all can be selected)

 

3. If using CMS/IWCF procedures, would you prefer this written procedure laid out as per Swimlane Example in the email you received?

 

4. If the 'swimlane' style role specific duties were introduced as part of the IWCF syllabus would you use it as part of the simulator training during Well Control school?

Check out our survey templates or create your own.